Confirm the cause
Do not replace a field to solve an untested blockage.
Check usable space
Review setbacks, groundwater, wells and existing improvements.
Select the design
The tank, treatment and field must work as one system.
Obtain permits
Confirm engineering and approval before excavation.
Plan long-term care
Advanced systems can add service contracts and operating permits.
